PMOpack
No one wants beautifully formatted wrong answers.

Transformation oversight you can defend.

Every board-page figure checked, traced to source, and justified in writing — before the SteerCo. Generated from your Monday or Jira export in about 60 seconds.

For the Transformation Director accountable to the board, the CFO, and the regulator.
Early access, onboarded by hand — bring one real pack and watch it get checked.
Coherence checkSteerCo · Project Phoenix · P4
Forecast at completion — matches Budget Tracker£2.41m
Go-live date — SteerCo = Milestone Report12 Sep
Decisions logged — every action owned3 / 3
🍉Programme RAG is Green over a Red workstream.CRITICAL
Data Migration is Red. A programme cannot show Green over a Red workstream. Flagged before the pack renders.
R2 · affects Exec Summary, slide 2
86
Publish blocked — 1 critical caught
Completeness 86/100 · resolve or accept with justification before the board sees it.
✓ 11 figures verified to source·Deterministic rule engine · no LLM in the validation layer
1
reconciliation break caught before SteerCo
0
watermelon packs allowed to render
~60s
Monday board → checked SteerCo pack
This is live. The check runs on every figure before a pack renders.
Deterministic rule engine — not an LLM's opinion
Aligned to ISO 21502 / 21505
Built for FCA-regulated governance
Append-only · audit-grade
The reporting tax

Sound familiar?

?
Figures you can't defend
A board member asks where a number came from, and the honest answer is "the last deck."
!
AI tools that make things up
Generic copilots invent a confident sentence with nothing underneath it.
Hours rebuilding packs
Every cycle, the same figures retyped by hand across six artefacts that then disagree.
The buyer

For the Transformation Director / EPMO Lead

You answer to the board, the CFO and the regulator. PMOpack means every figure has been checked and every exception justified before you present — no surprises, no 11pm reconciliation, no “let me come back to you on that.”

The champion

For the Head of PMO / Programme Manager

Stop re-checking your team’s numbers by hand. PMOpack verifies the figures across every artefact, so your people spend time on delivery, not cross-referencing spreadsheets.

Zero build

The templates are already written — by 17 years of delivery.

Stand up your own PMO tooling and you're maintaining a system by hand on top of your actual job. PMOpack gives you a board-ready SteerCo pack in about 60 seconds, from data you already have. No formula to break. No system to build.

Build-your-own
Ongoing effort
PMOpack
~60 seconds
What the engine catches

It checks the pack, not the page.

Every other tool validates one document at a time. PMOpack checks the whole reporting pack in a single pass — the same way, every time.

CROSS-ARTEFACT COHERENCE

If your SteerCo says 1 September and your Milestone Report says 1 October, that’s a CRITICAL flag.

No reviewer catches that across six documents at 11pm. The engine does, every time — before either page reaches the board.

date reconciliation · go-live
SteerCo cover14 Sep
Milestone Report07 Sep
Reconciled →12 Sep
“…residual exposure of£50Kpending mitigation.”
!No approved budget line for this figure
PHANTOM NUMBER

If your risk slide mentions £50K, we check the £50K is real.

PMOpack reads every figure in every narrative and reconciles it against the Budget Tracker. A number quoted in prose with no approved budget home gets flagged — the phantom figure buried in a sentence.

VERIFIED SOURCE MARKING

Every figure has a paper trail — and a human who signed it off.

Trace any number back to the file you uploaded and the PM’s verification note — see exactly which document backs it, and who signed off. Not “we used your file” — “your PM signed off on this file, on this date.”

£2.41m✓ VERIFIED
● source · finance_export.xlsx
● uploaded and marked verified by R. Patel
● value · £2.41m
✓ matches your uploaded Excel · attested by R. Patel, 28 Jun
SCHEDULE
Red
COST
Green
QUALITY
Amber
SCOPE
Green
1 red task on the critical path → workstream Red
CRITICAL-PATH PRIMACY

One red critical-path task turns the workstream red. That’s not a setting.

Generic tools roll up status by volume. PMOpack rolls up by delivery reality — a single red task on the critical path drives the whole workstream red, before any percentage threshold. Seventeen years of delivery says that’s how it actually works.

How it works

Three steps. Under a minute.

1
Upload verified sources
Excel, CSV, a Monday.com export, or a Jira export. Flag each as verified with a note.
2
The engine checks it
Deterministic board-defensibility checks, gap detection, a completeness score and a path to green.
3
Board-defensible artefact
Every figure traced to source, integrity-badged, ready to download.
The moat

It refuses to invent certainty

Every AI statement carries a status. Inferences are proposals only — nothing writes to your programme record without you.

✓ VERIFIED
Traced to a source and passed every rule.
● LOGGED
Recorded as stated, with who said it and when.
◇ INFERENCE
A suggestion you accept or reject. Never auto-written.
The deliverables

Two artefacts live today. Eight on the roadmap.

SteerCo Pack and Status Report generate now, from validated, source-attributed, PM-attested data, integrity-checked before they leave the room. The rest of the set is built into the rule engine and coming online next.

SteerCo PackLive
Integrity-checked ✓
SteerCo Pack
Decision-required board pack
Status ReportLive
Integrity-checked ✓
Status Report
RAG reconciled to source
RAID LogComing
RAID Log
Path-to-Green enforced
Milestone ReportComing
Milestone Report
Baseline vs forecast
WG ReportComing
WG Report
Working-group status, escalated
Risk Heat MapComing
Risk Heat Map
Reconciled to the RAID register
Plan on a PageComing
Plan on a Page
One-page programme roadmap
Budget TrackerComing
Budget Tracker
Forecast vs approved, reconciled
The proof — documented

I asked Microsoft Copilot to build a SteerCo pack. Here’s what it gave me.

On 30 April 2026 I ran the exact request a PM runs every week. Beautifully formatted — and the numbers didn’t reconcile. That gap, between a document that looks right and a record that is right, is the whole reason PMOpack exists.

› generate SteerCo pack from project data
Executive summary: RAG Green
Schedule: on track
⚠ detail: 2 milestones delayed, migration red
looks right. isn’t right. nobody checked.
The author of the rules

Built by someone who’s sat in the meetings.

17 years embedded in programme delivery — 35+ programmes, £75M+ documented savings, four countries. I’ve sat in 200+ SteerCo meetings and watched accurate-looking packs fall apart under one sharp question from the board. PMOpack is the tool I wanted in the room. I wrote the integrity rules from the failure modes I kept seeing.

— Justin Ramdeen, Founder
17
years in delivery
35+
programmes
£75M+
documented savings
4
countries

Verify one pack in minutes.
Trust every board figure at scale.

Every pound of saved cost or new revenue, traceable to source, signed, audit-ready, and regulator-defensible.

PMOpack